Timeline update. This is also posted on the website.
The May 2020 batch
Availability in May will be limited to a small quantity of Velka 3 cases (revision 1.2), ENP-7660B power supplies, VF-8010-PWM fans, and some new budget-oriented APU cases in pre-production status.
Please note that there will be fewer than 50 cases in total, that they will only ship to the United States, and that the Velka 3 stock is only expected to last a few minutes based on previous demand. We are working to get these ready as soon as possible and will have an exact availability date soon. Pre-orders will not be accepted for this batch.
The 2020 Velka models
Chinese New Year followed by the COVID-19 outbreak has resulted in a significant amount of production downtime, which has been used as an opportunity to heavily revise the current Velka models with a focus on structural integrity and appearance. These new models will be referred to as “revision 2.0” and are expected to become available in July 2020.
More details on the new models will be shared soon and ordering will become available when the shipping dates become certain.
Shipping
At this moment in time, we are only shipping throughout the United States with the exception of certain replacement parts for previous international orders. The impact that the COVID-19 outbreak has on shipping around the world is too unpredictable for us to give an estimate on when shipping outside of the United States can resume as per usual, but we plan to do so as soon as reasonably possible.
-----------------------------------------------------------------
Anyone know if "Preparing a Batch for May" means May start of production? May delivery?
Have a bunch of components just waiting for a case and debating whether to try to find a used one on the secondary market or if I should just try to practice some patience
my understanding is we can order in May and production starts in May. May delivery is just unthinkable to me but
@VELKASE Michael can prove me wrong?
anyhow I think improvements in revision 2.0 are worth the wait
Any listed availability dates will usually indicate when you can have it shipped. It looks like the revisions will be delayed until July.
Michael - I hope you never lose sight of what and why the Velka 3 is so loved. I like all your listed points of change for revision 2.0 so far, and can only think of one other change I would like to see. If possible, could you have the case finished all brushed or all blasted so it is one uniformed finish.
The new cases have a combination of smooth powdercoating and sandblasted aluminum of the same color, so the texture and appearance are more similar all-around than before.
any chance i can fit 4 x 2.5' hdd's in the new case config with no case fans, no cpu fan (mobo has low tdp inbuilt cpu) or gfx card. i was going build a nas with this case.
thanks
That would work in the rev 1.2 case but most likely not in the new case.
EDIT: The new APU case that will take care of the Velka 3 rev 1.2's APU functionality will not support 4 drives on the first release but it might be revised shortly after to support that.