Cant you put the radiator in/out to the back of the case?And another part of problem should be the plexy that fix the pump...
You should attach the PSU higher...but this will probably interfere with the passage of the tubes...
It must be at one side of the distro, covered by some metal sheet, so it can bright up the distro without burning out your eyesI dont mind the lack of RGB, can just put some generic led strips behind the distroplate. But yah if you can add option for some nicely fitting RGB. i'll propably get it. As my GPU and CPU waterblocks have RGB.
Something like this?If will be distroplate 1.1 or 2.0 with optional flowmeter, I'll hope it will be sold separately.
Because don't want make, install any other in loop.
Gonna ask @alauder can he make it. And just realize there is no space for the D5 cover. Its 1-2mm clearence between the psu and the D5.Yes.
Yes, still no I'll try the vertical.If PSU in most top position, still no space for cover?
Also hope for vertical PSU mount, cables to distroplate. With SFX (no L) will be a lot of space for cables, pump cover.
Unfortunatelly not. Watercooling is more in priority, also SSDs are getting really cheap these days 1x 3.5" drive + 120/140+240/280 rads are possible tho.Is there any room for 3.5 hard drives if we have radiators both top and bottom?
Wow!there is a space for a 120 rad with a standard 25mm fan.
You can just use 1*120rad under the psu with the large expand, 1*120/140 fan under the mobo (ram) and a 240/280 in the top if you need this extra fan.Wow!
If possible set DDC pump with res (combo) instead of PSU, may be I will order two and sold Sliger.
Need space for bottom fan for ram, picopsu cooling.
Everythings seems fine, just talked a lawyer today, and turned out I must need to start this business at next year (because some finance stuff I'm not to good at these) ,so the preorder will be at the 2nd of January (because everybody hangover at 1st.. lol), if everything arrives. Sorry its a "must" delay, I cant do anything with it.How is the work going, any update on the timeline for 1st batch?
Optimum is definitely the SFF yt channel, but from what I've seen he mostly uses AIOs in his reviews. Considering this case begs for a custom loop, perhaps you could try to find a YouTuber/modder that specializes in custom water-cooling loops to see what they could do with it as well!Everythings seems fine, just talked a lawyer today, and turned out I must need to start this business at next year (because some finance stuff I'm not to good at these) ,so the preorder will be at the 2nd of January (because everybody hangover at 1st.. lol), if everything arrives. Sorry its a "must" delay, I cant do anything with it.
I need to test:
- the glass panels, that will arrive around 10-15th december
- the distros, that will arrive in this week, and the DDC distros (1-2 week)
- the fined and anodized metal parts, that arrive around next week
- and the feets, thats are in my country now but idk where..
I want some photos from the final modells, thats take some days, and need to prepare the website for the preorders.
And I'll send a piece to Ali (OptimumTech yt) and hopefully the HardwareCanucks guys for review, before the end of this year.
If somethings went wrong in the testings, I have still some spare time to fix it
I think there will be a maximum number of preorders of 50pieces.