Do you have an estimate on the difference in weight for the Cerberud X?
Compared to my last statement, I've found a trusted and honest review on Delid Core i7 7700K.Based on main scenario on cerberus-X, I'm more and more in mood to get rid of Kabylake due to its pretty bad thermal compound on IHS. It's even worse than Skylake. That means delid Kabylake is almost mandatory to OC properlly.
Even for SLI, X99+6850K or AM4 seems to come back as my first choice. X99+6850K is offering a sweet sli with full pcie 3 16x bandwidth...that is clearly future proof when pci-e 4 will arrive. (pci-e3 16x will match performance of pci-e 4 8x)
I'm still pretty impressed by sli of gtx 1070 results compared to CF...even I'm supporting more AMD gpu generally...clearly it will be though choice at the end..
Sorry for this old topic unearth..Forgot that the X41 won't fit on the bottom so I mounted it to the bottom front instead:
Once again I'm thankful to whoever designed this case such that all the panels come off because it makes it so much easier to work in.
Problem with the X41 in that position though is that it can't fit 10.5" cards with a standard thickness fan. A slim fan would work but I don't have a slim 140mm on hand so I have moved the rad up and put the card in a lower slot and that works
I really hope AMD and Intel are generous with the PCIe lanes on the next-gen boards because I love the flexibility of being able to move the card around to whatever slot I want but having to get a $200+ board and $600 CPU to do that sucks.
If I understood properlly, on X99 MB, you can use whatever pcie 16X slot for GPU, as long as these port are also 16x electrically?
It'll get there, and we will all be right here patiently waiting to throw our money at you.Ugh, it's been a year and the case still isn't out yet T_T
Any updates on that slow boat? Sorry if it sounds a little pushy...
General production is waiting on a shipment of the internal power cords for connecting a front-mounted SFX/SFX-L PSU to the rear of the case. It didn't make it onto a boat before Chinese New Year though so they won't even leave China for another few weeks, then it has to transit the Pacific.
So we're a few months away at least for general production.