Normal
So it had been a long while, and I wanted to update on the current status as the target was mid December, which is now.The riser cables have arrived.We got confirmation that the production of the frames is finished. The shipping was delayed due to a storm, so we are still waiting on that but we are optimistic it will be soon.The wood pieces have all been cut and are currently being finished, expected to ship this Friday.The manual is done, and can be viewed/downloaded from the product page (under documents):[URL unfurl="true"]https://artesianbuilds.com/pluto/[/URL]I should have more updates soon, as the core pieces start arriving, as well as new photos of the cases
So it had been a long while, and I wanted to update on the current status as the target was mid December, which is now.
The riser cables have arrived.
We got confirmation that the production of the frames is finished. The shipping was delayed due to a storm, so we are still waiting on that but we are optimistic it will be soon.
The wood pieces have all been cut and are currently being finished, expected to ship this Friday.
The manual is done, and can be viewed/downloaded from the product page (under documents):
[URL unfurl="true"]https://artesianbuilds.com/pluto/[/URL]
I should have more updates soon, as the core pieces start arriving, as well as new photos of the cases