Reply to thread

OP, when you say "available," do you mean you expect it to be here in 24-48 hours, or that it is generally available?  The NCase M1 is available if you are willing to get on the next waiting list and sign up for a distribution in a particular time window.  The Cooler Master NR200 is releasing on 15 August, with the NR200P releasing in September.  What's your timeframe?