Normal
Exactly how I see it, it's NR200 with better compatibility. In NR200 I had to cut the bottom and front of the frame to fit 4090 without it being bent upwards, and I'm definitely not interested in wasting my time like that again. Also, I don't want to deal with risers and 12VHPWR adapters/sharp cable bends. I need a case that solves my problems, not adds others. R1 is basically that, good-looking, reasonable-sized case that I can build and don't stress about compatibility issues. That's the same thing I would want from C4V2.Edit:Back to the original question, we don't know what C4V2 will look like (I don't think Dan himself has finalized the design), so no point in speculating on comparison with R1. Maybe we will see more concrete C4V2 specs once 50xx GPUs are released, which can happen either Q4 this year or Q1 next year, then add time to incorporate that into design/production etc. So I don't think C4V2 will be released soon. While R1 is finalized and will go into production around August. So if you need a case now - get R1, if you can wait - wait.
Exactly how I see it, it's NR200 with better compatibility. In NR200 I had to cut the bottom and front of the frame to fit 4090 without it being bent upwards, and I'm definitely not interested in wasting my time like that again. Also, I don't want to deal with risers and 12VHPWR adapters/sharp cable bends. I need a case that solves my problems, not adds others. R1 is basically that, good-looking, reasonable-sized case that I can build and don't stress about compatibility issues. That's the same thing I would want from C4V2.
Edit:
Back to the original question, we don't know what C4V2 will look like (I don't think Dan himself has finalized the design), so no point in speculating on comparison with R1. Maybe we will see more concrete C4V2 specs once 50xx GPUs are released, which can happen either Q4 this year or Q1 next year, then add time to incorporate that into design/production etc. So I don't think C4V2 will be released soon. While R1 is finalized and will go into production around August. So if you need a case now - get R1, if you can wait - wait.