Reply to thread

It's done (almost) - at least everythings inside, every cable connected, pressure test done. I now need to fill the loop, then i wanna let it sit for a while before POSTing first time.


Building the dual-rad setup is not easy. I'm glad that i ordered the enterprise quick connects, the allow me to take out everything without needing to drain the loop (again). But putting it all together was quite a hassle. Figuring out how to route, where to put a tube, which way i wanna go with which adapter etc. That's why I did order (a bit...) too much stuff from alphacool, cause i just could not plan it. Also the tubes are neccessary if you wanna take of the side rad to get into the case - which is quite easy now. It's also mixed with 13/10 and 16/10, cause in some areas there just was no place to put a 16/10, but otherwise in some areas i needed a tight bend which is impossible with the 13/10 (some bends look on the pics tighter than they really are :-)).


Now i'm trying to fill it (not yet 100% sure how) - then comes some testing and if it works some more details about the build :-)


[SPOILER="Pictures inside :-)"]


[/SPOILER]