Reply to thread

Well, after thinking about the time schedule for this, it'll have to be a KISS design. I want to keep March free for other projects so really this will need to be wrapped up by end of February.


So I'm thinking finish up design by end of January. Get quotes, manufacturing (which I hope to take video of if it's fabbed locally), and testing done in February.


It's a tight schedule but I got STX160.0 designed and fabricated within 1 month so it should be doable if the feature scope doesn't get out of hand.


I need to get OBS setup as a backup to John in case he's unavailable for our special CES livestream so I'm tentatively planning to do a brainstorming livestream to test it Wednesday evening (Central time) to start roughing things out.